![]() |
|||||||||||||||
|
Two weekends later: 10" of snow blanketed the yard. I spent Christmas Eve packing down a path with the lawn tractor so I could get lumber out to the "job site". After that I got the siding finished for the last two walls. The door is ordered and roof rollers are in progress.
|
|||||||||||||||
|
I put the last two sides up by myself which took a little doing. But a little forethought saved me a ton of effort and got me to the point you see here. I put up full sheets and then cut the top of flush with the Sawzall.
|
|||||||||||||||
|
This wall will have the drop section in it. I'll go back later and cut the siding to allow movement. Big hinges will take care of the mechanical needs.
|
|||||||||||||||
|
A long break in the action! But I'm not finished.
|
|||||||||||||||
| © 2007 Arctic Rail, No part of this web site may be reproduced in any form without the express consent of Arctic Industries. | |||||||||||||||