So we started filling the hole...and filling and filling.
48 inches deep and 12+ inches in diameter takes a lot to fill.
Shakin' it down...
Here go the first shovel-fulls.  Erik has the vibrator under control.
The rebar is in place.
With a little cement in the bottom, we set the rebar cage in place. It was a fine piece of engineering. Click here to see it before installation.
A fine fill.
Finally we had it somewhat full and then I ran out of cement.  Quick trip to Lowe's for another ten bags.  We're almost done.
Dude, we made it!
We set the J-bolt fixture in place and finished the fill.  Here is a picture of the fitxture the night before. Those are 1" diameter stainless steel monsters in there. This should last at least a week!
960 lbs of cement, a few gallons of water and some wood for forms.  The pier is poured.